KCJ Engineering Company Profile

34 | P a g e YEAR PROJECT CLIENT DETAILS PROJECT VALUE 2015 GOVERNMENT BUILDINGS SUEZ DOMAIN SDN BHD Block D, KL Gateway Suez Domain • Air Conditioning & Ventilation System Supplying, Installation & Testing & Commissioning RM 8 MIL 2016 HOSPITAL JABATAN KERJA RAYA MALAYSIA The Proposed Development of Hospital Rembau, Negeri Sembilan (76 Beds), Phase 2 – Development Works and Other Related Works at LOT PT 738, Pekan Chembong, Rembau, Negeri Sembilan • Building Automation System RM 912 K UNIVERSITY / INSTITUTION TUNAS SELATAN SDN BHD The Development Of Residential College at Pagoh Higher Education Hub, at LOT PTF 14417, Mukim Jorak, Muar, Johor Darul Takzim • Air Conditioning & Mechanical Ventilation System & Fire Protection System Installation RM 2.2 MIL ROAD & BRIDGE CHENGALJATI SDN BHD Membina Lebuhraya Kota Bharu ke Kuala Krai Kelantan Pakej 2A: Kadok ke Ketereh • Earthworks & Bridge Works RM 52 K 2017 PALACE JABATAN KERJA RAYA PERLIS Istana Perlis, Jalan Eaton • Air Conditioning System Repairing Works for Bilik Mengadap Utama & Underground Piping System Upgrade RM 172 K ROAD & BRIDGE JABATAN KERJA RAYA MALAYSIA / KEMENTERIAN TENAGA AIR & TEKNOLOGI HIJAU MALAYSIA (KETTHA) Ministry Of Works (KKR) Complex, Kuala Lumpur • Replacement of Six (6) units of chiller & other components in chiller plant room under energy audit, re-profit & energy management, Ministry of Green Technology & Water (KETTHA) program • AHEAD 81 DAYS RM 4.1 MIL JABATAN KERJA RAYA MALAYSIA Ministry of Works (KKR) Complex • Long-Term Improvement Works for Eleven (11) Elevator Units By The Method of Modernisation • AHEAD 7 DAYS RM 4.5 MIL JABATAN KERJA RAYA MALAYSIA Ministry of Works (KKR) • Fire Alarm System Improvement • AHEAD 1 DAYS RM 795 K 2018 HOSPITAL JABATAN KERJA RAYA MALAYSIA Tengku Ampuan Rahimah Hospital (Obstetric Complex) Klang, Selangor Darul Ehsan – Phase 2 • Air Conditioning & Transfer RM 8.9 MIL HOSPITAL RASMA CORPORATION SDN BHD Hospital Raja Permaisuri Bainun Ipoh, Perak (Woman Anc Child Block and Cardiology Centre) • Air Conditioning & Ventilation System Supply, Delivery, Installation & Testing & Commissioning RM 24.1 MIL ROAD & BRIDGE AFTER IMAGE SDN BHD Pembinaan Persimpangan Bertingkat (Elevated T-Junction) di atas Lintasan Keretapi di Pekan Tanah Merah, Kelantan • RC Work for Hollow Box and Structure Works RM 40 K 2019 HOSPITAL AIM CONCEPT SDN BHD The Proposed Construction of Hospital Pengajar Universiti Putra Malaysia (HUPM) Serdang, Selangor Darul Ehsan • Fire Protection System RM 7.5 MIL GOVERNMENT BUILDINGS PROJEK LEBUHRAYA USAHASAMA BERHAD (PLUS) Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Air Conditioning Unit & Related Works at Selected Location Along the North South Expressway Central Region • Air Conditioning RM 2.7 MIL 2020 COVID-19 2021 HOSPITAL JABATAN KERJA RAYA MALAYSIA The Proposed Construction of Hospital Bachok, Kelantan • Air Conditioning & Ventilation System Supply, Delivery, Installation, Testing & Commissioning RM 9.5 MIL

RkJQdWJsaXNoZXIy MjI4ODEyNw==